Runs needed–
Balls left–
Current run rate–
Required run rate–
The formulas
Current run rate = runs ÷ overs faced. Required run rate = runs still needed ÷ overs left. Overs are counted in balls, so 11.2 overs is 11 overs and 2 balls (68 balls), not 11.2 in decimal.
Is the chase on?
A required rate up to about 9 an over is usually gettable in a T20 with wickets in hand; above 12 it is a tall order. In an ODI, anything over 7 late in the innings with few wickets left is hard.
More calculators
Questions fans ask
How do you calculate required run rate?
Runs needed ÷ overs remaining. For example, 85 needed from 8.4 overs (52 balls) is 85 ÷ 8.667 = 9.81 an over.
How do you calculate current run rate?
Runs scored ÷ overs faced, counting each over as 6 balls. 96 from 11.2 overs is 96 ÷ 11.333 = 8.47.